Tuesday, January 27

day . 06

it rained. a lot! well not really a lot, i am a whimp when it comes to rain. anywho. it was quite confusing as to where everyone was supposed to meet. at first on site, then the shop, then back to the site. but everyone got the message and we finished unloading the ICF's off the truck that gtcc started. and after many calls to robert we finally got a plan and moved them to the back of the site around the footings. they were so much heavier than i thought they would have been. and huge! it took 5 people to move one bundle. and there were 24 bundles. we had to put 2 2x4's through at about hip height, and squat down and put the 2x4 on our shoulder and press back up! needless to say i got a work out. once everyone got on the same page and working as a team it went very quickly. they all were moved in about an hour.

oh and the first one we moved i picked up my part and the stack tilted back and poured water all down my arm inside my jacket. it was lovely. ha.

cant wait for a warm shower!