Saturday, March 21

day . 42

it was another 8am Saturday and cold. We started off the day by finishing the large beam that went across the front of the entrance to support the curtain wall. We had to nail together 4 2x12’s. the thing was super hefty. After all 3 beams were assembled josh and cody carried them over and we used the “do not use as a crane” trackhoe crane to lift them into place. It was a precarious venture but it worked and the front of the building looks good. After those were in I moved to the living area to take down all the scaffolding to make room for Adrian to grade the room. I am exhausted after this week. I kept running into things and tripping today it was terrible. I stepped off the side of the ramp with a huge scaffolding in my hand and bruised the heck out of my knee. I need sleep.