today when we got to site and got ready to finish the pipe there was a poor bird that was trapped in some string on the north side of the building. cody, robert and i rescued him. the poor little guy was so freaked out we had to cover him with a tshirt and lift him out and get the string that was wrapped around his wing and his neck off. we were able to free him and he flew off! once our rescue was done cody and i took apart all the piping and began priming it and cementing it all together. the longer we were down in the trench with the glue the loopier we got. the fumes definitely got to us. we were laughing at everything. it was pretty funny. once that was done we moved to putting waterproofing onto the matron suite roof. this was another task that we were assigned at like 5:30 but cody and i stayed until it was complete, around 7:30. neither cody nor i had done much waterproofing so it took us a little while to get into the groove and of course once everyone left it was hard for us to concentrate over the rock music and intense air banding. but we got it done.
No comments:
Post a Comment