day . 7o

so today was a day filled with small tasks. we moved wood around the site, out of the building and into neat stacks around the site. then at about 5 robert informed cody and i that we needed to build a hand rail on the green roof. so we gathered all the 2x4’s and 1x4s that we could find and moved them to the roof. we cut vertical pieces at about 42 inches to use as the vertical supports and then used whatever other 2x4’s and 1x4’s we could find to work as a horizontal bracing. we were finally finished around 6:30 or so and even though the handrail was not too sturdy it was done. i would not trust my life to it but it is just temporary so it will work…i hope.