Friday, June 19

day . 97 | 19

today was HOT. i got to site and cody lauren and josh had been there since 6 so i got up working with them as soon as i got there. robert got there shortly after i did and pointed out that the way we had installed the first panel would allow the water to drip into and under the roof. so we had to remove the first and second panel that had been put up and put a new full panel in against the wall. we then worked the rest of the day installing all of the panels on the first gabled roof. it went rather smoothly save for josh dropping a drill on the panel and it almost sliding right into my face! i ducked just in time and didnt die. throughout the day i worked again leading mira's group as to how to prep the other part of the gabled roof to be ready for roofing panels. once it was prepped i helped them get the first 2 drip edges up and got the side drip edge ready to be installed. it is getting easier to work on one task but go back to another group and answer questions and help with tasks.
josh on the roof with the drill that tried to kill me!

No comments:

Post a Comment