rebar was here today! yay! so we got right to cutting and bending the last pieces that needed to be bent for the 8 course wall and the horizontal rebar that was needed for the 13 course wall. it took a little finagling and calculating on adrian and i's part to get it right but we figured it out! we wanted to have to horizontal rebar all cut and figured out so when the ICFs were here and starting to go up there would be no running to get rebar but we could out them right in. after the rebar was all cut and bent cody and i finished installing the roof trusses. with 2 people working on them it went super fast. we also had to go around and fix a LOT of the vertical rebar that was not directly in the center of the horizontal rebar but was sitting up against the interior walls. so that was just not going to do so a good many had to be untied re positioned and re tied. but it all was fixed and good to go for the pour.