day . 26

today we again had lots of little tasks to finish. the short side curtain wall that serves as the main entrance into the site right now needed to be made. so i jumped on that for the start of the day. the ICFs jsut needed to be cut at half height and rebar tied to the top chair that is left. putting in the rebar was a little difficult because it had to go into either wall on either end, so it was ahrd to guide it in. after they were in we had to brace the short wall with 2x6's on either side that were flush on the top. once that was done we built an amazing ramp complete with 'chicken cleats' to go over the short wall so it was more safe to climb over since it is the main entrance and so that the ICFs wont get all beaten up. cody and i then moved on to putting the last handrails up on the scaffolding just to get it up off the ground so it will not get stolen. at the end of the day we had to wait for a load of lumber to get there that was around 4 hours late. so it finally came as the sun was going down and it was getting super cold. we got the truck unloading and were off to rest up for the upcoming week.

No comments:

Post a Comment