i started the day by setting up the transit in the large front suite area so we could continue to grade by hand what was not able to be graded with the trackhoe. caroline and i shot the areas that needed the most work and began to dig with cody and renee w. we worked with shovels and the pick axe to get the ground to the proper height of 2 inches below the top of the footings. we were able to rake some of high areas into holes that were nearby which cut down on the wheelbarrowing a lot. once some of the holes were filled i helped cody tamp them down with the tamper.
before that was finsihed robert sent cody and i to work on the knee walls for the green roof. they are only 10 inches tall, jsut enough to hold in the dirt and plants on the roof. we measured for the front wall and the back wall and began putting them together. once cody had all the stud blocks cut caroline came and helped and we moved to putting them together. we got all 8 sections for the front and back put together by the end of the day and will move to getting them installed for tomorrow. and also work on getting the two side knee walls done once the other 2 are put into place.
before that was finsihed robert sent cody and i to work on the knee walls for the green roof. they are only 10 inches tall, jsut enough to hold in the dirt and plants on the roof. we measured for the front wall and the back wall and began putting them together. once cody had all the stud blocks cut caroline came and helped and we moved to putting them together. we got all 8 sections for the front and back put together by the end of the day and will move to getting them installed for tomorrow. and also work on getting the two side knee walls done once the other 2 are put into place.
No comments:
Post a Comment